成人无码h肉动漫在线观_国产理论片在线观看_校霸犯错被学霸罚带钢笔去上课_日本不卡一二视频_丰满的少妇愉HD高清免费_男女啪啪做爰高潮全过有多重_丁香婷婷色五月激情综合蜜芽_国产免费视频+精品视频_欧美午夜国产精品_av无码一级毛片免费

Hong Kong Power Transmission Project

2020-01-12 21:38:00
admin
Original
2296

Project Overview

An overhead transmission line (OHL) monitoring system is installed on a tower or pole to monitor the condition and status of tower / pole line components for conducting technical feasibility studies according to the CLP design.

Transmission Tower:

Transmission Pole:

Transmission line condition monitoring equipment is expected to be installed at multiple project sites according to CLP plan. When the performance of the monitoring equipment and system is satisfactory, consideration will be given to extending the installation. During daytime / light hours, all CCTV cameras should be allowed easy identification of property of tower / polar line components such as vegetation barriers at all visible points from the CCTV camera installation (excluding geographic restrictions) to a specified distance (400kVOHL tower line span: ~ 400m; 132kVOHL polar line span: ~ 200m).

Future video surveillance devices will cover CLP 400 kV and 132 kV overhead lines according to CLP plan.

1) Number of 400 kV overhead towers = 566 (Hong Kong edge)

2) Number of 132kV overhead towers = 122 (Hong Kong side)

3) Number of 132kV overhead power poles = 854 (Hong Kong side)

Running result:

     


      


白天效果
Daytime effect

夜間效果
Night effect




Contact Us
Phone : 0755-83150898/0755-83151222
Fax : 0755-83150161
Website : enetcom.cn/
Address : Santachi Building, 306 Xuegang North Road, Longhua, Shenzhen